WAPT · Jackson · 2022
Renewing WAPT’s transmission infrastructure.
A renewed 38 kW transmission plant with installed transmitter cabinets, RF distribution, and supporting cooling systems.
Explore the build · 14 photographs ↓
My role
As WAPT Director of Engineering, I led planning, procurement, vendor coordination, and implementation for the transmitter capital project.
Project scope
- 38 kW transmitter deployment
- RF line and equipment installation
- Cooling and plant infrastructure
The photographs follow equipment staging, overhead RF installation, cooling systems, and the installed transmitter plant.
Project gallery
From the starting point to the finished result.
14 photographs · Select an image to enlarge it, then use the arrows to follow the build.