Eric Head.
← All projects

WAPT · Jackson · 2021

Building the WAPT studio.

A new broadcast studio with an illuminated anchor desk, integrated displays, scenic walls, and a dedicated weather presentation area.

Explore the build · 15 photographs ↓
Completed anchor desk and illuminated set
Completed anchor desk and illuminated set
My role

I led studio construction and technical integration as WAPT Director of Engineering, coordinating capital planning, vendors, and implementation.

Project scope

  • Studio construction and scenic installation
  • Lighting and display integration
  • Production equipment and technical coordination

The completed studio includes the anchor desk, weather presentation area, integrated displays, and lighting. The build sequence shows the infrastructure and installation work behind that result.

Project gallery

From the starting point to the finished result.

The previous WAPT studio before the rebuild
01 · BeforeThe previous WAPT studio before the rebuild
Former studio set during dismantling
02 · RemovalFormer studio set during dismantling
Removed scenic components and cleared production space
03 · RemovalRemoved scenic components and cleared production space
Removed cabling during studio preparation
04 · RemovalRemoved cabling during studio preparation
Exposed overhead grid during infrastructure preparation
05 · InfrastructureExposed overhead grid during infrastructure preparation
Studio cleared for construction and installation
06 · Room preparationStudio cleared for construction and installation
Floor preparation before scenic installation
07 · Room preparationFloor preparation before scenic installation
First scenic wall and display elements being installed
08 · Set installationFirst scenic wall and display elements being installed
Scenic walls and set components during installation
09 · Set installationScenic walls and set components during installation
Curved illuminated header structure during assembly
10 · Set installationCurved illuminated header structure during assembly
Header, wall finishes, and display openings during installation
11 · Set installationHeader, wall finishes, and display openings during installation
Desk and display integration during installation
12 · System integrationDesk and display integration during installation
Completed weather presentation area
13 · Finished resultCompleted weather presentation area
Completed anchor desk and illuminated set
14 · Finished resultCompleted anchor desk and illuminated set
Panoramic view of the finished studio
15 · Finished resultPanoramic view of the finished studio
← All projectsNext: KSBW · Studio construction →