Eric Head.
← All projects

WESH · Orlando · 2024–2026 photography

Modernizing the WESH newsroom.

Renewed newsroom workspaces, assignment-area displays, flooring, and finishes within a broader WESH modernization effort.

Explore the build · 14 photographs ↓See the finished newsroom ↓
Finished newsroom: assignment area and surrounding workstations
Finished newsroom: assignment area and surrounding workstations
My role

As Director of Engineering, I led engineering and facilities coordination for a newsroom renovation that addressed aging infrastructure and accumulated modernization needs. I balanced renovation requirements with the station’s ongoing operational needs, connecting workspace improvements, technical infrastructure, and production requirements.

Project scope

  • Facilities and technical coordination
  • Workstations and production infrastructure
  • Shared newsroom environment

The work brought together facilities, workstations, cabling, lighting, and production infrastructure within the broader station renovation. The photographs document the progression from the former workspace through construction to the renewed newsroom and central assignment area.

The broader WESH challenge

Modernizing decades-old infrastructure.

The newsroom renovation was part of a broader modernization challenge I took on at WESH. Much of the station’s existing equipment and infrastructure was more than 30 years old. The accumulated needs extended across HVAC, chillers and VAV systems, control rooms, satellite uplink and downlink equipment, restrooms, and furnishings. As Director of Engineering, I worked through these legacy conditions while balancing capital improvements with the demands of daily broadcast operations.

The newsroom photographs document one part of that wider effort. Sales-office furniture was also replaced shortly before my departure in September 2026.

Reducing infrastructure risk

WESH’s modernization needs extended beyond the newsroom. Approximately 30-year-old chillers, VAV hardware, and the fire alarm control system presented reliability, maintenance, and lifecycle concerns. I led their replacement to address those risks, improve workplace temperature control, and modernize critical building systems.

Alongside LED lighting conversions in Studio 2, the newsroom, and Sales, these investments supported a more dependable, comfortable, and efficient working environment.

Completed infrastructure improvements

Project gallery

From the starting point to the finished result.

Before renovation: crowded workstations and exposed cabling · March 2024
01 · BeforeBefore renovation: crowded workstations and exposed cabling · March 2024
Flooring work within the newsroom · March 2024
02 · Room preparationFlooring work within the newsroom · March 2024
Removal work with ceiling access and dismantled materials
03 · ConstructionRemoval work with ceiling access and dismantled materials
Cleared workspace with the ceiling infrastructure exposed
04 · ConstructionCleared workspace with the ceiling infrastructure exposed
Frames laid out across the newsroom during reconstruction
05 · ConstructionFrames laid out across the newsroom during reconstruction
Wall and doorway work during the renovation
06 · ConstructionWall and doorway work during the renovation
Lighting infrastructure above the central newsroom · May 2025
07 · InfrastructureLighting infrastructure above the central newsroom · May 2025
Finished newsroom: renewed workstations and open floor layout
08 · Finished resultFinished newsroom: renewed workstations and open floor layout
Finished newsroom: circulation space and production equipment
09 · Finished resultFinished newsroom: circulation space and production equipment
Finished newsroom: illuminated architectural details and workstations
10 · Finished resultFinished newsroom: illuminated architectural details and workstations
Finished newsroom: assignment desk, workstations, and surrounding finishes
11 · Finished resultFinished newsroom: assignment desk, workstations, and surrounding finishes
Finished newsroom: assignment area and surrounding workstations
12 · Finished resultFinished newsroom: assignment area and surrounding workstations
Finished newsroom: elevated view of the assignment desk and illuminated branding
13 · Finished resultFinished newsroom: elevated view of the assignment desk and illuminated branding
Finished newsroom: completed assignment desk and integrated displays
14 · Finished resultFinished newsroom: completed assignment desk and integrated displays
← All projectsNext: WESH · Production control →